|
General Hints
|
|
|
Hardware, general:
|
please check hardware first with AdminTool software, this
software tool can be found on the t5U InfoCD or on the
tec5
website for downloading |
|
FEE boards:
|
the Front End Electronics Boards are available in various
version, i.e, different type of connectors. Please check
FEE
versions
for details |
|
CCD preamplifier
boards:
|
Drawing
CCD Sensor Board
|
Drawing
CCD Logic Board
|
Drawing
CCD Power Supply Board
|
|
Software:
|
please check regularly for latest updates of drivers and
other software tools on the tec5 website www.tec5.com |
|
Firmware:
|
from time to time tec5 upgrades and expandes
the firmware of the electronic boards
please contact us in case you are interested in
features so far not supported
|
|
Cables:
|
try to keep cable length as short as possible
please apply shielding when cables are longer than
50cm
by the way: the longest PCI cable tested and still
OK was 8m long
and USB cables are by sepcification no longer than
5m |
|
Grounding:
|
is very important for a proper video signal
combine all GND lines to a central location, mainly
at the metal chassis of your instrument housing
|
|
Integration Times:
|
minimum readout time (except for InGaAs arrays)
maximum integration time 6.5sec as standard
maximum integration can be extended to 65 seconds
(see MS_Pro_datasheet
for use with MultiSpec Pro software, see PI_Infosheet
for use with Programmer Interface)
|
|
Documentation:
|
for each electronic board there is a detailed
documentation, please contact us in case you are missing
this document
documents are not for free donwloading, but are
on our t5U InfoCD
|